Donnybrook Building
Inspections
★★★★★ 4.8 on Google · 570+ reviews

Frame inspection in Donnybrook

The frame is the last look at structure, and in Donnybrook it is where the most serious findings sit.

  • After frame and trusses are up and the roof is on, before sarking
  • 1 to 2 hours on site
  • Report within 24 hours
Get a price for your Donnybrook inspectionA minute to complete, and you are not committed to anything.

Fully licensed & accredited

Stage3 of 7
When to bookAfter frame and trusses are up and the roof is on, before sarking
Time on site1 to 2 hours on site
Inspected againstAS 1684 (timber framing), AS 4100 or NASH for steel frames, the engineer's bracing and tie-down plan, NCC Part 3.4

What is included in a Donnybrook frame inspection

  • Stud, plate, lintel and beam sizes against AS 1684 and the engineer's drawings
  • Wall straightness and plumb, top plate level
  • Floor level across the slab
  • Bracing type, position and fixing against the bracing plan
  • Tie-downs from roof to wall and wall to slab
  • Triple grips, straps and bolt fixings
  • Jack studs, lintels and trimmers over every opening
  • Window sill trimmers for wide openings
  • Roof truss spacing, fixing and girder connections
  • Valley boards, ceiling battens and roof bracing
  • Window and door openings against the plans
  • Wet area framing, noggings and service penetrations
  • Damaged, split, notched or over-drilled members
  • Termite collars and slab penetrations still visible
Why it matters here

Frame inspections on Donnybrook builds

Beams shown on the drawings and never installed, porch posts skew nailed rather than tied down, and truss top chords cut have all been recorded on Donnybrook frames.

What we find at this stage in Donnybrook

  • Beams from the drawings not installed
  • Porch post tie-downs relying on skew nails
  • Roof bracing not extended and bent as required
  • Truss top chords cut or jointed
  • Timber bottom plates overhanging the slab by more than 10mm
  • Slab extending beyond the frame by over 20mm
Roof bracing not extended and bent as the standard requires, Donnybrook
Roof bracing not extended and bent as the standard requires
Slab extending beyond the timber frame by over 20mm, Donnybrook
Slab extending beyond the timber frame by over 20mm
Sample findings

Sample defects found during our frame inspections in Donnybrook

Annotated findings from Frame inspections on Donnybrook builds. Client addresses withheld.

Beams shown on the drawings not installed, recorded during a frame inspection in Donnybrook
Beams shown on the drawings not installed
Porch post fixed with skew nails instead of a rated tie-down, recorded during a frame inspection in Donnybrook
Porch post fixed with skew nails instead of a rated tie-down
Joints observed in the top chords of the rear hip truss, recorded during a frame inspection in Donnybrook
Joints observed in the top chords of the rear hip truss
Bottom plates overhanging the slab by more than 10mm, recorded during a frame inspection in Donnybrook
Bottom plates overhanging the slab by more than 10mm

The other stages of a Donnybrook build

  1. Bored piers inspection in Donnybrook1Bored piersOnce holes are bored and cages placed, ahead of any concrete
  2. Slab pre-pour inspection in Donnybrook2Slab pre-pourThe day before the pour, with pods, steel and formwork still open
  3. Lock-up (pre-plaster) inspection in Donnybrook4Lock-up (pre-plaster)Once roof, cladding and external doors are on, before plaster arrives
  4. Fixing inspection in Donnybrook5FixingAfter mouldings, doors and joinery, before the painter
  5. Waterproofing inspection in Donnybrook6WaterproofingOnce the membrane is on and cured, before tiling starts
  6. Pre-handover (PCI) inspection in Donnybrook7Pre-handover (PCI)About a week ahead of your practical completion date

All construction stage inspections in Donnybrook →

Guides

Construction stage guides for Donnybrook

All guides →

Book a frame inspection in Donnybrook

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Frame inspections in Donnybrook: common questions

Why does frame matter more than the rest?

It is the final point at which structure is visible. Everything after it is concealment.

What is wrong with skew nailing a porch post?

It is not a tie-down. A post carrying roof load needs a fixing rated for uplift, and skew nails are not that.

Do you check the trusses?

We check support, fixing and bracing, and we record any chord that has been cut. Certification of the truss design comes from whoever fabricated it.

What if the builder disputes it?

Each finding cites the drawing or the standard, which makes it a factual discussion.

Which standards apply?

AS 1684 for timber framing, with AS 4055 governing wind classification.

Can any of this be seen later?

Not without opening walls, which is the entire reason for the stage.