Boundary fences and post depth in Donnybrook

When a fence fails and nobody accepts responsibility.

Owner Inspections · Donnybrook 3064 · 2026-01-15

In short: A Donnybrook investigation found a rear fence semi collapsed with inadequate post embedment.

What we investigated

A rear boundary fence found in a semi collapsed state, with the owner and builder disagreeing about cause.

Post embedment

The depth a post is set into the ground is a measurement, not an opinion. It was inadequate for the fence it carried.

Capping

Top capping not adequately fixed, with sections loose.

Why measurement settles it

Once the embedment depth is measured against the requirement, the argument changes shape.

What the report gives you

The finding, the shortfall and what should have been done.

Written by the Owner Inspections team from inspections carried out in Donnybrook. Licensed building practitioners, Building & Plumbing Commission registration CDB-U 53425.

Guides

More defect reports guides for Donnybrook

All guides →

Book a building inspection in Donnybrook

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Questions Donnybrook owners ask about this

Is a fence covered by the build contract?

It depends on the contract. The report establishes the facts either way.

Can this go to VCAT?

Yes, provided the report has been prepared in expert witness form.

Do you dig the post out?

No, embedment is assessed without destructive work where possible.

How long does it take?

It runs longer than a routine inspection, since the work is investigative.