In short: Trades follow each other quickly here. These are the points where work vanishes.

A fixed program leaves narrow gaps

An estate build runs to a schedule, and the space between one stage finishing and the next covering it is commonly two or three days.

Slab pre-pour

Book the day ahead of the pour. Beams, laps, chairs and pod debris are all visible now and never again.

Frame

Where the serious Donnybrook findings live. Missing beams, porch post fixings and cut truss chords.

Lock-up

Termite protection, anti-ponding boards and roof damage, in the days before the plasterer.

Waterproofing

Once the membrane is on, ahead of the tiler.

Pre-handover

A week out from completion, so the list is with the builder before you sign.

Written by the Owner Inspections team from inspections carried out in Donnybrook. Licensed building practitioners, Building & Plumbing Commission registration CDB-U 53425.

Guides

More new construction stage inspections guides for Donnybrook

All guides →

Book a building inspection in Donnybrook

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Questions Donnybrook owners ask about this

If I can only afford two?

Frame and pre-handover.

How much notice?

A day or two, but flag it early.

Do dates slip?

Constantly.

Can I book the lot?

Yes, and it produces the fullest record of the build.

CallGet a Free Quote